The last train operate was hauled by exactly the same locomotive that ran the main provider (no.1 in 1896 was the 1st engine to steam into Queenstown). The rail and various movable objects were lifted taken off-web-site, leaving a lot of the bridges intact. If this railway journey remains a https://andrewe951ddd8.azuria-wiki.com/user